To edit, add comments or upload photos: Sign In
PowerDot - Supermarché Match - Wissembourg, Peuplierscharging location
Nearest Address:
33 Allée des Peupliers
Wissembourg
Grand Est
67160
France
Number Of Stations/Bays:
8
Usage:
Public
Operational Status:
Operational
Latitude:
49.029246599153055
Longitude:
7.960669451406261
OCM Ref: OCM-478363
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
6 Present
OCM-CN-803422
200 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-803423
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-803424
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
1 Present
OCM-CN-803425
100 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
PowerDot - Supermarché Match - Wissembourg, Pépinière
0.68 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E Bike Station Hotel Schweigener Hof
1.5 Miles
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
E-Bike Station Gaststätte Deutsches Weintor
1.58 Miles
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
St. Urban-Platz 1
1.72 Miles
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Weinstr. 18b
2.92 Miles
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Supermarkt Edeka
3.5 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E-Bike Station Weinstube "Unter der Linde"
4.21 Miles
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
E-Bike Station Kakteenland
4.48 Miles
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
E-Bike Station Gasthof Waldeslust
4.88 Miles
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In