To edit, add comments or upload photos: Sign In
(DAYA GREEN) Hotel Pop Diponegorocharging location
Nearest Address:
(DAYA GREEN) Hotel Pop Diponegoro,
Jl Pangeran Diponegoro
Surabaya
Jawa Timur
60421
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh
Operational Status:
Operational
Latitude:
-7.2930666111776645
Longitude:
112.73731092577987
OCM Ref: OCM-478724
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-804182
7 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Terminal Joyoboyo
0.39 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Embong Wungu
0.83 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPKLU Center Surabaya
0.92 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) Ciputra World Mall
1.19 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Intiland Tower
1.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PT Utomodeck Metal Works
1.44 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Praxis
1.47 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Park & Ride Gunung Sari
1.53 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) Maspion Square
1.56 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In