To edit, add comments or upload photos: Sign In
Kopi Bathok charging location
Nearest Address:
Kopi Bathok, Jl Cahyana Baru, Purbalingga
Purbalingga
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh ++
Operational Status:
Operational
Latitude:
-7.393601
Longitude:
109.366552
OCM Ref: OCM-479919
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-805728
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 8 matching results
PLN ULP Purbalingga
0.27 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ra Cheng Ho Purbalingga
5.26 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Purwokerto Kota
7.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Living Plaza Purwokerto
8.96 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN UP3 Purwokerto
9.52 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Banyumas
10.12 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Queen Garden Hotel
10.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Resto Kampoeng Pule
14.93 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In