To edit, add comments or upload photos: Sign In
Volvo - Concessionária Lagom - Teresinacharging location
Nearest Address:
Av. João XXIII, 3993 B, Santa Isabel, Teresina, PI, Cep: 64003-087
Teresina
Brazil
Usage:
Public - Membership Required
Operational Status:
Not Operational
Latitude:
-5.0801737
Longitude:
-42.760295
OCM Ref: OCM-481347
Data Provider:
Easy Volt https://www.ezvolt.com.br
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC-0
Providers Ref:
7aae1932-e42f-471a-b950-ade119953abf
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Not Operational
1 Present
OCM-CN-808386
7 kW
AC (Single-Phase)
220 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 8 matching results
Lagom Volvo
0.03 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Arrey Express
0.26 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Audi Center Teresina
1.62 Miles
Public - Notice Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Notice Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TEM CARREGADOR - EUROBUSINESS RAUL LOPES TERESINA
2.53 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BR Super Carga - VMachado Zona Leste
2.67 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
[RL Energia] Hotel São Pedro - 40 kW - Teresina/PI
3.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eletroposto Parque da Cidadania
3.05 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
[RL Energia] Gold Eventos - 60 kW - Teresina/PI
1
3.75 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In