To edit, add comments or upload photos: Sign In
Virta UPM Joroisten Taimitarhacharging location
Nearest Address:
Kotkatlahdentie 121
Joroinen
79600
Finland
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
62.185915
Longitude:
27.857444
OCM Ref: OCM-483547
Data Provider:
NordOCPI https://nordocpi.viaaq.eu
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC0
Providers Ref:
18729875-3b30-4592-b0e5-16c75c0a1939
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-811480
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Jari-Pekka Joroinen
0.85 Miles
Level 2 : Medium (Over 2kW)
Unknown
Level 2 : Medium (Over 2kW)
Unknown
Jari-Pekka – Joroinen
0.92 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
eParking Lehtoniemen koulu
7.83 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
ABC ABC Varkaus
8.2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Recharge ABC Varkaus
8.24 Miles
Level 3: High (Over 40kW)
CHAdeMO
Level 3: High (Over 40kW)
CHAdeMO
eParking Könönpellon päiväkoti
8.42 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
eParking Navitas 1
8.68 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
eParking Soisalo-opistotalo
8.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
eParking Uimahalli Ilopisara
8.79 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In