To edit, add comments or upload photos: Sign In
Electrolinera Energía de Pereiracharging location
Nearest Address:
Av La independencia Calle 72
Frente al Exito de Cuba
Pereira
Risaralda
Colombia
Number Of Stations/Bays:
3
Usage:
Public - Membership Required
Usage Cost:
1764
Operational Status:
Operational
Latitude:
4.803612
Longitude:
-75.7369151
OCM Ref: OCM-486362
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Operational
1 Present
OCM-CN-817972
40 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-817973
40 kW
DC
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-817974
40 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Centro Comercial Pereira Plaza
3.12 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CDA VILLA
3.45 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cerritos del Mar
5.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Castilla Plaza
6.77 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Tambo El Privelegio
7.78 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Hotel Campestre Lagos De Venecia
9.86 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
NEMA 6-15
Public
Operational
Level 2 : Medium (Over 2kW)
NEMA 6-15
Upload your own photos for this location: Sign In