Produktionstechnisches Zentrum der Uni Hannovercharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Die Einfahrt zum Parkplatz des PZH nehmen, bis zum Ende durchfahren. Auf der linken Seite ist der große Ladesäulenkasten leicht erkennbar. 2 kostenlose Parkplätze 24/7 nutzbar ohne Ladekarte. Status sichtbar in RWE ekwh App sowie RWE Ladesäulenfinder
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Not Operational) ]DC-Laden ist derzeit nicht möglich, RWE weiß seit dem 22.10.2016 Bescheid
Comment by Fridgeir 10/29/2016 17:10:04
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Renault Zoe an 43kW AC. Geladen bis 91% mit voller Leistung, das heißt alle 20s 1% mehr Akkuladung!
Comment by Erna_Schleck 11/03/2015 10:13:02
Other Charging Locations
There are 9 matching results
Einkaufszentrum Möbel hesse
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sparkasse
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
VW Autohaus Kahle
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rathaus
2
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Jädekamp 33
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Park & Ride Parkhaus Wissenschaftspark
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Continental Tor 2 (F+E)
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Park & Ride Parkplatz Stadtbahnhaltestelle Garbsen
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Finca & Bar Celona
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Super unkompliziert.
Uploaded by Rohlfing on 2016-07-12
Uploaded by Erna_Schleck on 2015-11-03