To edit, add comments or upload photos: Sign In
Parcheggio di Piazza Risorgimentocharging location
Nearest Address:
Via Broli
Angolo via Kennedy
Arzignano
VI
36071
Italy
General Information:
Per utilizzare la colonnina è necessario registrarsi al sito http://www.futuroelettrizzante.it/registrazione Una volta registrati la colonnina è prenotabile e si attiva con un SMS.
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
gratis
Operational Status:
Operational
Latitude:
45.5191858937443
Longitude:
11.3303813430306
OCM Ref: OCM-52931
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-65894
AC (Single-Phase)
SCAME Type 3A (Low Power)
Operational
1 Present
OCM-CN-65895
3 kW
AC (Single-Phase)
240 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
EnelX Conad Arzignano
0.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AUTOVEGA car dealership
1.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BeCharge via Cima Telegrafo
2.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Via Stadio
2.36 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Piazza Giovanni Paolo II
2.91 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Agsm Aim Viale Della Vittoria
2
3.28 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
OMC srl
3.35 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity Sorelle Ramonda Alte Ceccato
2
3
5.25 Miles
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sorelle Ramonda
1
3
5.31 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)