Eneldrive Bologna Centrale FScharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]A due passi dalla stazione ferroviaria e dal Parco della Montagnola. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-bologna-bo-via-cesare-boldrini-2-t15746.html
https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-bologna-bo-via-cesare-boldrini-2-t15746.html Comment by ForumElettrico.it 02/11/2021 17:20:19
Other Charging Locations
There are 9 matching results
I Portici Hotel Bologna
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Bologna Piazza dei Martiri | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Cairoli
1
5
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Montebello
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Via Righi
4
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Comune di Bologna - Palazzo Bonaccorso
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Fioravanti | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Mascarella | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11