To edit, add comments or upload photos: Sign In
Pioneer on Mainway and Appleby Linecharging location
Nearest Address:
4499 Mainway
Burlington
Ontario
L7L 7P3
Canada
General Information:
Eaton Level II, part of GridSmartCity project. See http://www.gridsmartcity.com/ for more info.
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
43.38760249626951
Longitude:
-79.78201746940613
OCM Ref: OCM-5692
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Operational
1 Present
OCM-CN-441
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Pioneer Fuel Station
0.03 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Shell Recharge - C12416 Burlington EV
0.07 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Shell Canada
0.08 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Oasis at Mainway
0.24 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
APPLEBY ARENA APPLEBY ARENA 2
0.28 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Eaton Canada
0.29 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FENGATE STATION CT4K-GW1
0.46 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Longo Brothers Fruit Markets Inc
0.62 Miles
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLO Ultra - Canadian Tire - Burlington North
0.93 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In