Parcheggio Campo di Martecharging location
Sistema "Autostrada Ciclabile" http://www.comune.lucca.it/flex/cm/pages/ServeAttachment.php/L/IT/D/6%252F6%252Fc%252FD.361ef231d0a39ffa143b/P/BLOB%3AID%3D14954/E/pdf
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
SCAME Type 3C (Schneider-Legrand)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/colonnine-comune-7-4kw-parcheggio-campo-di-marte-lucca-lu-via-nicola-barbantini-t3051.html Comment by ForumElettrico.it 06/23/2018 17:48:17
[ General Comment ]https://www.forumelettrico.it/forum/colonnine-comune-7-4kw-parcheggio-campo-di-marte-lucca-lu-via-nicola-barbantini-t3051.html
Comment by ForumElettrico.it 06/23/2018 17:48:07
Other Charging Locations
There are 9 matching results
Lucca Parcheggio Campo di Marte | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Autostrada Ciclabile Dante
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
LUCCA Bacchettoni | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Lucca Tiglio
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Autostrada Ciclabile Ponzianio
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Autostrada Ciclabile Fermi
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Lucca Ponte San Quirico | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LUCCA Macelli | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Grand Hotel Guinigi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2018-06-23
Uploaded by ForumElettrico.it on 2018-06-23
Uploaded by ForumElettrico.it on 2018-06-23
Uploaded by ForumElettrico.it on 2018-06-23