E-Bike Station Waldkletterpark Oberbayerncharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
4 abschließbare Fächer im Ladeschrank im Kletterpark plus 4 Lademöglichkeiten an Steckdosenleiste. Wechselnde Öffnungszeiten, während der Ferien täglich von 10-19Uhr geöffnet, siehe Webseite.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Park & Ride Parkplatz am Bahnhof
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bahnhofsplatz
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tiefgaragenplatz in Petershausen
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E-Bike Station Kloster Scheyern
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Schloss Hohenkammer
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ladepunkt Vierkirchen
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Ludwig-Thoma-Straße 37
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gewerbestraße 7
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Wings of Future
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In