Cascina Danicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Autostrada A21 Torino- Piacenza-Brescia,uscita Asti Est, seguire in direzione di Alba.Uscire dalla superstrada seguendo le indicazioni Nizza-Canelli sulla strada del "Turchino". Dopo l'abitato di Montegrosso d'Asti,sempre seguendo verso Canelli,passata la corta galleria sotto il paese di Agliano,arrivati alla rotonda,girare a destra verso Costigliole.A 800 metri,sulla destra,trovate Cascina Dani.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/colonnina-scame-tipo-2-agriturismo-cascina-dani-agliano-terme-regione-dani-23-t2595.html Comment by ForumElettrico.it 04/12/2018 07:53:25
[ General Comment , Charged Successfully ]https://www.forumelettrico.it/forum/colonnina-scame-tipo-2-agriturismo-cascina-dani-agliano-terme-regione-dani-23-t2595.html
Comment by ForumElettrico.it 04/12/2018 07:53:05
Other Charging Locations
There are 9 matching results
Villa Fontana Relais
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
MOASCA SP109 | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Marzano Oliveto SP6 | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cascina San Michele
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
L'Aja della Mirusina
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Europlug 2-Pin (CEE 7/16)
Enel X Conad
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Viticoltori Associati di Vinchio - Vaglio Serra | ENELX Fast
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Canelli Solferino | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Canelli Robino | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2018-04-12
Uploaded by ForumElettrico.it on 2018-04-12
Uploaded by ForumElettrico.it on 2018-04-12
Uploaded by ForumElettrico.it on 2018-04-12
Uploaded by aldodal on 2017-01-15