Apostolic Church of Barbertoncharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
80622
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Gsk 3736 Mount Vernon Blvd.
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Amazon DC AKC1
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Fred Martin Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Serra Chevrolet
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Bridgestone Akron
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Serra Acura
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Serra Honda
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
AKRON METRO RTA METRO PUBLIC
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CHAdeMO
SUMMIT TOYOTA FRONT STATION
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In