To edit, add comments or upload photos: Sign In
ABB Newave in Quartinocharging location
Nearest Address:
Via Luserte Sud 9
Quartino
6572
Switzerland
General Information:
Maximum Charging time 2 hours.
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
3
Usage:
Public
Usage Cost:
Free
Operational Status:
Operational
Latitude:
46.150259150305644
Longitude:
8.911318666201051
OCM Ref: OCM-84520
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-120005
50 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-120006
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-120007
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign In[ Important Notice (For Other Users) , Charging Spot Not Accessible (Access locked or site closed) ]No more gratis charger
Comment by GZac 09/14/2021 09:26:29
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Ottima colonnina Ultrafast gratuita e sempre accessibile, complimenti ad ABB Ticino per l'installazione
Comment by polianto 05/28/2017 19:05:37
Other Charging Locations
There are 9 matching results
Monte Ceneri Supercharger
0.79 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Cadenazzo
1.25 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GOFAST Cadenazzo
1
1.27 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Sportivo
2
1.34 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emotì Evpass Centro sportivo del Gambarogno
1.43 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Emotì Evpass Municipio di Gudo
2.25 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
5 Via Serrai
3
2
2.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tognetti Auto in Gordola
2.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl - Sant'Antonino
2
3
2.62 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)