Evway Parcheggio Stazione Borgo Valsugana Estcharging location
Per utilizzare la colonnina è necessaria la APP evway.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]A 5 minuti dal centro, con molti servizi e attrazioni da visitare. Leggi la recensione qui > https://www.forumelettrico.it/forum/colonnina-evway-2x22kw-borgo-valsugana-stazione-autocorriere-t6783.html
https://www.forumelettrico.it/forum/colonnina-evway-2x22kw-borgo-valsugana-stazione-autocorriere-t6783.html Comment by ForumElettrico.it 04/10/2020 06:52:49
Other Charging Locations
There are 9 matching results
Borgo Valsugana Via Roma | Neogy
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Conad City Telve | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Farmacia Strigno Dr. Borsato Luigi
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BE CHARGE FAST Via Val dell'Orso
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ladestation Hotel Imperial
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Ladestation Hotel Cristallo
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Municipio di Castel Tesino | Neogy (ex ACSM)
1
1
Public - Membership Required
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ladestation Camping Castel Tesino
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Coop Levico Terme | NEOGY
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-04-10
Uploaded by ForumElettrico.it on 2020-04-10
Uploaded by ForumElettrico.it on 2020-04-10
Uploaded by ForumElettrico.it on 2020-04-10