Rasthof Hünxe Ostcharging location
Inbetriebnahme 01.12.2017! 24/7 nutzbar.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
EnBW (D) https://www.enbw.com/privatkunden/tarife-und-produkte/e-mobilitaet/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rasthof Hünxe West
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Junkersfeld 1
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
E-Bike Station Rathaus
1
2
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
In der Beckuhl 4
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Oscar Perdok GmbH
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
E-Bike Station Vor dem Restaurant/Hotel
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Rathaus
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Zum Grunewald
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Energiering 11
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In