Greystone at Maple Ridge Phase Icharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Two Clipper Creek Charging Stations 32-Amp. Works with ALL plug-in vehicles including the Chevy Bolt, Tesla Model 3, Chevy Volt, Nissan Leaf, Kia Soul, Ford C Max, etc. Located behind clubhouse in phase 1.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Greystone at Maple Ridge
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Greystone Farms
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CCGVT CSN-01790778
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Greystone Farms Reserve
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Homewood Suites By Hilton Columbus
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Homewood Suites by Hilton Columbus - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Greystone at Oakland
Private - For Staff, Visitors or Customers
Operational
HYUNDAICOLUMBUS DC STATION
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
HYUNDAICOLUMBUS STATION 1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In