Estación de Servicio El Portazgo Zoilo Ríos Zaragozacharging location

Nearest Address:
Autovía de Logroño Km. 0,300
Zaragoza
Zaragoza
50011
Spain

976 403 403
General Information:

Charger was changed in november 2019. Pasar por la tienda para iniciar y terminar la carga. Apps Electromaps, EVCharge

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 4
Usage: Public - Pay At Location
Usage Cost: 0,45€/kWh
Operational Status: Operational
Latitude: 41.6603499145001
Longitude: -0.92509127381595
OCM Ref: OCM-97183
Network/Operator

(Business Owner at Location)

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CHAdeMO

Operational
1 Present
OCM-CN-137992
50 kW DC
400 V
125 A

CCS (Type 2)

Operational
1 Present
OCM-CN-137993
50 kW DC
380 V
125 A

Type 2 (Tethered Connector)

Operational
1 Present
OCM-CN-137994
7 kW AC (Single-Phase)
400 V
64 A

CCS (Type 2)

Planned For Future Date
1 Present
OCM-CN-547310
150 kW DC
1000 V
250 A

ABB Terra HP175 Charger

Add your own comment/check-in for this location:

Sign In
Rating: 4 out of 5 [ General Comment , Did Not Visit Location ]

Charger was changed in November 2019.

Comment by Amarre 12/10/2019 21:27:53

Other Charging Locations

There are 9 matching results

Mitsubishi Autonicolás
 

Carretera de Logroño
Miralbueno
Aragón
50011
Spain
View
0.06 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F

BMW Goya Automoción
 

Carretera de Logroño
Miralbueno
Aragón
50011
Spain
View
0.1 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

E.S. Los Ibones
  1

Paseo Lagos de Alba 2
Autovía Logroño
Zaragoza
Zaragoza
50011
Spain
View
0.12 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Centro Comercial Augusta
  5

Avenida de Navarra, 180
Zaragoza
Zaragoza
50011
Spain
View
0.22 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F

Calle de Sergio López Saz (Endesa)
  1

Calle de Sergio López Saz
Miralbueno
Aragón
50011
Spain
View
0.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Carrefour Zaragoza
 

CC Augusta
Zaragoza
Spain
View
0.33 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Cepsa Miralbueno
  1

Carretera Logroño 42
Zaragoza
Zaragoza
Spain
View
0.36 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Calle Ibón de Marboré (Endesa)
  1

Calle Ibón de Marboré
Miralbueno
Aragón
50011
Spain
View
0.42 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Ionity - Zaragoza
  1

CAMINO ZARAGOZA - MONZALBARBA
Zaragoza
Aragon
50011
Spain
View
0.51 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Upload your own photos for this location: Sign In

Uploaded by lm-ocm on 2024-05-12

Pantalla de carga CCS.

Uploaded by Amarre on 2019-12-22

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Nuevo cargador en noviembre de 2019.

Uploaded by Amarre on 2019-12-10

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09

Uploaded by Amarre on 2018-01-09