Centro Commerciale Ramondacharging location
2 Tesla Connectors, up to 22kW.Available for customers + 1 for all EV. Self park. Utilizzabile solo durante gli orari di apertura del negozio.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ingresso del parcheggio da Via Fratelli Cervi
Tesla (Tesla-only charging) http://www.teslamotors.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Tesla (Model S/X)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/tdc-22kw-ac-sorelle-ramonda-via-gaetano-salvemini-bovisio-masciago-mi-coordinate-esatte-della-colonnina-45-603926-9-t2333.html Comment by polianto 02/21/2018 19:25:56
Other Charging Locations
There are 9 matching results
Limbiate Mille | Becharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Carrefour
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIMBIATE Buozzi | BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIMBIATE Villa Pusterla | BECHARGE
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eliotecnica sas
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIMBIATE XXV Aprile | BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X AdS Q8
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Piazza Del Mercato Senago
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Unknown
Enel X Way Q8
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)