LIDL Busto Arsiziocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lidl https://info.lidl/en
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]it works, used right now with opel corsa-e
Comment by AndreaL77 10/10/2020 10:43:18
[ General Comment , Failed to Charge (Equipment Problem) ]Sabato 01/02/2020 con la nuova Zoe non è partita la ricarica . Leggi la recensione completa qui > https://www.forumelettrico.it/forum/lidl-busto-arsizio-viale-della-repubblica-t8418.html
https://www.forumelettrico.it/forum/lidl-busto-arsizio-viale-della-repubblica-t8418.html Comment by ForumElettrico.it 05/12/2020 06:46:34
Other Charging Locations
There are 9 matching results
Olgiate Olona San Giorgio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
COOP Busto Arsizio
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Carrefour
2
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel D120
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Unknown
AGESP SERVIZI
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
U2 Supermercato Busto Arsizio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Busto Arsizio Stazione FNM
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Busto Arsizio
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-05-12