Todi Ponterio | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Vicino ci sono centri commerciali, bar, INPS, notai, ed una fontanella di acqua pubblica. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-type-2-2-22kw-todi-provincia-di-perugia-loc-ponte-rio-t8898.html
https://www.forumelettrico.it/forum/colonnina-enel-x-type-2-2-22kw-todi-provincia-di-perugia-loc-ponte-rio-t8898.html Comment by ForumElettrico.it 07/14/2020 16:50:08
Other Charging Locations
There are 9 matching results
Ewiva Todi
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Campo Sportivo di Ponterio | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Europalace Hotel Todi | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Becharge Todi Montecristo
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Conad Todi | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Tempio della Consolazione
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
TODI XXV Aprile | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero di Todi | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Monte Castello Rovere
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-07-14
Uploaded by ForumElettrico.it on 2020-07-14
Uploaded by ForumElettrico.it on 2020-07-14
Uploaded by ForumElettrico.it on 2020-07-14