Campo Sportivo di Ponterio | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]In posizione leggermente delocalizzata rispetto ad attività commerciali o di ristoro. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-todi-perugia-loc-ponte-rio-voc-bodoglie-t10292.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-todi-perugia-loc-ponte-rio-voc-bodoglie-t10292.html Comment by ForumElettrico.it 03/21/2021 15:19:19
Other Charging Locations
There are 9 matching results
Todi Ponterio | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Todi
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Europalace Hotel Todi | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Becharge Todi Montecristo
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Conad Todi | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Tempio della Consolazione
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
TODI XXV Aprile | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero di Todi | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Monte Castello Rovere
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-03-21
Uploaded by ForumElettrico.it on 2021-03-21
Uploaded by ForumElettrico.it on 2021-03-21
Uploaded by ForumElettrico.it on 2021-03-21