Tortona Ezio Vanoni | BeChargecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ] https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-tortona-al-via-viguzzolo-angolo-via-vanoni-t5120.html Comment by ForumElettrico.it 02/06/2020 10:55:14
Other Charging Locations
There are 9 matching results
Mondobrico Tortona
1
3
Private - For Staff, Visitors or Customers
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Oasi
3
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Tortona Silla | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Brigata Garibaldi | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona De Gasperi | EnelX
1
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Porta Ticinese | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Tito Speri | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Tortona
1
1
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Municipio di Tortona | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-02-06
Uploaded by ForumElettrico.it on 2020-02-06
Uploaded by ForumElettrico.it on 2020-02-06