Ewiva Oasicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 233 kW ma attenzione che solo la colonnina di destra è da 300 kW mentre quella di sinistra è da 150 kW. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post500245.html#p500245
https://www.forumelettrico.it/forum/post500245.html#p500245 Comment by ForumElettrico.it 08/23/2025 14:09:44
[ General Comment , Charged Successfully ]2 connettori 150 kW e 2 da 300 kW
Comment by Roberto 05/19/2022 20:00:22
[ General Comment , Equipment & Location Confirmed Correct ]4 connettori CCS Combo 2 da 150 kW presso il parcheggio dell’iper di Tortona. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-enel-x-ultrafast-iper-tortona-t20218.html
https://www.forumelettrico.it/forum/colonnine-enel-x-ultrafast-iper-tortona-t20218.html Comment by ForumElettrico.it 12/23/2021 06:52:39
Other Charging Locations
There are 9 matching results
Tortona Brigata Garibaldi | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Silla | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mondobrico Tortona
1
3
Private - For Staff, Visitors or Customers
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona De Gasperi | EnelX
1
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Ezio Vanoni | BeCharge
1
3
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Porta Ticinese | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tortona Tito Speri | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Tortona
1
1
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Municipio di Tortona | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-08-23
Uploaded by ForumElettrico.it on 2025-08-23
Uploaded by ForumElettrico.it on 2025-08-23
Uploaded by ForumElettrico.it on 2025-08-23
Uploaded by ForumElettrico.it on 2025-08-23
Uploaded by Ernesst on 2023-04-23
Uploaded by ForumElettrico.it on 2021-12-23
Uploaded by ForumElettrico.it on 2021-12-23
Uploaded by ForumElettrico.it on 2021-12-23
Uploaded by ForumElettrico.it on 2021-12-23