Concessionario Nissan Resicar S.R.L Alessandriacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
PlugSurfing https://www.plugsurfing.com/ +49 30 9599814 10
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-fast-nissan-alessandria-al-via-clemente-a-spinetta-marengo-t6097.html Comment by ForumElettrico.it 07/03/2019 14:22:32
Other Charging Locations
There are 9 matching results
Hotel Diamante Alessandria
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Alessandria Retail Park Est | Driwe
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Alessandria Retail Park Ovest | Driwe
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge Eni
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PENNY Market Alessandria | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Alessandria Via San Giovanni Bosco | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Fast Sede Enel
2
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Duferco PSA GrandiAuto
1
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
A2A MD Quartiere Pista
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2019-07-03
Uploaded by ForumElettrico.it on 2019-07-03
Uploaded by ForumElettrico.it on 2019-07-03
Uploaded by ForumElettrico.it on 2019-07-03
Uploaded by ForumElettrico.it on 2019-07-03