TOKA #103 MOECOcharging location
https://play.google.com/store/apps/details?id=com.tokamobile.TokaApp
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Станция находится перед автосалоном электромобилей MOECO. Время работы: 24/7 Парковка: бесплатно На станции три порта: №1. CHAdeMO, 50kWt, №2. Combo 2/CCS, 50kWt №3.Type 2 - кабель, 43kWt Вставьте кабель в зарядную станцию и в электромобиль. После чего запустите процесс зарядки при помощи карты ТОКА или мобильного приложения "TOKA Network". В случае необходимости подтвердить начало зарядки - на экране нажать "Start" (верхняя правая кнопка). При возникновении вопросов, звоните круглосуточно Call Center +38(044)-222-66-88
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Собранецкая улица
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Go To-U @ ТЦ Дастор
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
VIP Wash
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
F1128 FLASH біля маг-ну Зіна
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TOKA #1197 BRSM Fast Charger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ЖК Crystal
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Recharge ТЦ "Новий"
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GreenLine AC/DC by ND (80 kW) #10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Delivery
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In