Go To-U @ ТЦ Дасторcharging location
To charge, you need to install the "GO TO-U" mobile application iOS: https://apps.apple.com/ua/app/to-u/id1175538017 Android: https://play.google.com/store/apps/details?id=com.go.tou Then, select a charging station on the map and reserve it for the required time. When you arrive at the location, insert the cable into charger and into the car, click "Start charging" in the app. More detailed information - in the "About our service" section of the GO TO-U app. More GO TO-U charging stations are displayed exclusively in the mobile application. You must have your own cable to charge!
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Go ToU https://go-tou.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
GB-T DC - GB/T 20234.3
Type 2 (Socket Only)
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
VIP Wash
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Собранецкая улица
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
TOKA #103 MOECO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
F1128 FLASH біля маг-ну Зіна
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TOKA #1197 BRSM Fast Charger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ЖК Crystal
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Recharge ТЦ "Новий"
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Delivery
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
GreenLine AC/DC by ND (80 kW) #10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In