Questura di Rovigo | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Fra le colonnine più comode per visitare il centro storico. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-questura-di-rovigo-ro-viale-tre-martiri-44-t13175.html
https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-questura-di-rovigo-ro-viale-tre-martiri-44-t13175.html Comment by ForumElettrico.it 10/04/2020 16:33:26
Other Charging Locations
There are 9 matching results
Stadio Mario Battaglini Rovigo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Rovigo di Vittorio
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVA+ Rovigo Porta Adige
4
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ROVIGO Viernheim | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ROVIGO Porta Adige | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
BeCharge Viale Porta Po
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Rovigo
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ CONAD Rovigo
3
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-10-04
Uploaded by ForumElettrico.it on 2020-10-04
Uploaded by ForumElettrico.it on 2020-10-04
Uploaded by ForumElettrico.it on 2020-10-04
Uploaded by ForumElettrico.it on 2020-10-04
Uploaded by ForumElettrico.it on 2020-10-04