BeCharge Viale Porta Pocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Lidl Rovigo
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ROVIGO Viernheim | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ CONAD Rovigo
3
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVA+ Rovigo di Vittorio
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Questura di Rovigo | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Girolamo Savonarola
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stadio Mario Battaglini Rovigo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Rovigo Porta Adige
4
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In