Maranello Amendola | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con card Be Charge sulla presa di sinistra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post340814.html#p340814
https://www.forumelettrico.it/forum/post340814.html#p340814 Comment by ForumElettrico.it 10/20/2022 09:49:43
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-maranello-mo-piazza-giovanni-amendola-10-t8518.html Comment by ForumElettrico.it 01/01/2020 15:20:44
Other Charging Locations
There are 9 matching results
Enel X Municipio
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Parco giardino Ferrari
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Nuovo Terminal Autobus
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MD Maranello
2
2
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Maranello Claudia | EnelX
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Museo Ferrari
5
12
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Maranello Toscanini | EnelX
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Spezzano Via Statale | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia MD Ubersetto
1
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-20
Uploaded by ForumElettrico.it on 2020-01-01
Uploaded by ForumElettrico.it on 2020-01-01
Uploaded by ForumElettrico.it on 2020-01-01
Uploaded by ForumElettrico.it on 2020-01-01