Spezzano Via Statale | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con NFC Enel X Way sulla presa Tipo 2. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post338638.html#p338638
https://www.forumelettrico.it/forum/post338638.html#p338638 Comment by ForumElettrico.it 10/11/2022 15:45:44
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-fiorano-modenese-mo-via-statale-83-spezzano-t9242.html Comment by ForumElettrico.it 02/13/2020 18:04:12
Other Charging Locations
There are 9 matching results
Fiorano Modenese Bocciodromo | EnelX
2
6
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Volturno | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Museo Ferrari
5
12
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Maranello Claudia | EnelX
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
JoinOn Hotel Executive
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ubersetto Monte Ave Enel X | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Parco giardino Ferrari
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Municipio
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia MD Ubersetto
1
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-11
Uploaded by ForumElettrico.it on 2020-02-13
Uploaded by ForumElettrico.it on 2020-02-13
Uploaded by ForumElettrico.it on 2020-02-13
Uploaded by ForumElettrico.it on 2020-02-13