Centro Sportivo Barca | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo il centro sportivo Barca dotato di diversi impianti sportivi ed un bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-centro-sportivo-barca-bologna-bo-via-raffaello-sanzio-11-a-t23230.html
https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-centro-sportivo-barca-bologna-bo-via-raffaello-sanzio-11-a-t23230.html Comment by ForumElettrico.it 02/05/2022 11:59:06
Other Charging Locations
There are 9 matching results
Be Charge Lorenzetti
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Concessionario Jaguar Bologna Premium by Neogy
2
5
(Unknown)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Casteldebole | EnelX
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Calda
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supercharger Bologna c/o Centro la Meridiana
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Centro Meridiana
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Audi Zentrum Casalecchio
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Nettuno tennis club
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-02-05
Uploaded by ForumElettrico.it on 2022-02-05
Uploaded by ForumElettrico.it on 2022-02-05
Uploaded by ForumElettrico.it on 2022-02-05
Uploaded by ForumElettrico.it on 2022-02-05