Hera Nettuno tennis clubcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
HeraRicarica Pubblica https://heracomm.gruppohera.it/casa/mobilita-sostenibile/ricarica-pubblica 800.087.591
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Oltre ai campi da tennis troviamo anche bar, ristorante, palestra e campi da calcetto coperti e scoperti. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hera-21-kw-nettuno-tennis-club-bologna-bo-via-petronio-fancelli-t25117.html
https://www.forumelettrico.it/forum/colonnina-hera-21-kw-nettuno-tennis-club-bologna-bo-via-petronio-fancelli-t25117.html Comment by ForumElettrico.it 05/14/2022 09:53:07
Other Charging Locations
There are 9 matching results
Bologna Andrea Costa | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Calda
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero Monumentale di Bologna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Lorenzetti
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Stadio Renato Dall'Ara
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Irma Bandiera | HERA
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge MAST
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Cimabue | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Baracca BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-05-14
Uploaded by ForumElettrico.it on 2022-05-14
Uploaded by ForumElettrico.it on 2022-05-14
Uploaded by ForumElettrico.it on 2022-05-14
Uploaded by ForumElettrico.it on 2022-05-14