Fiorano Modenese Santa Caterina | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Attraversando la piazza del mercato troviamo subito un paio di bar, una pizzeria ed un ristorante. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post299748.html#p299748
https://www.forumelettrico.it/forum/post299748.html#p299748 Comment by ForumElettrico.it 05/02/2022 09:42:56
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-fiorano-modenese-mo-via-santa-caterina-da-siena-37-t8879.html Comment by ForumElettrico.it 01/25/2020 10:58:17
Other Charging Locations
There are 9 matching results
Fiorano Modenese Silvio Pellico | EnelX
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Fiorano Modenese | EnelX
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
JoinOn Hotel Executive
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Ciliegi | EnelX
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Volturno | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Agorà Leonardo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Bocciodromo | EnelX
2
6
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Parco Amico
1
5
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Parco Amico
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-05-02
Uploaded by ForumElettrico.it on 2020-01-25
Uploaded by ForumElettrico.it on 2020-01-25
Uploaded by ForumElettrico.it on 2020-01-25
Uploaded by ForumElettrico.it on 2020-01-25