Fiorano Modenese Bocciodromo | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema passando card Be Charge ed infilando il cavo nella presa di destra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post409785.html#p409785
https://www.forumelettrico.it/forum/post409785.html#p409785 Comment by ForumElettrico.it 11/01/2023 15:42:30
[ General Comment , Charged Successfully ]Accanto abbiamo la Bocciofila Fioranese dotata anche di bar con bagno, biliardo e calcio balilla. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-bocciodromo-di-fiorano-modenese-mo-via-antonello-mondaini-1-spezzano-t13007.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-bocciodromo-di-fiorano-modenese-mo-via-antonello-mondaini-1-spezzano-t13007.html Comment by ForumElettrico.it 09/26/2020 10:06:38
Other Charging Locations
There are 9 matching results
Spezzano Via Statale | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Volturno | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
JoinOn Hotel Executive
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Santa Caterina | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Museo Ferrari
5
12
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Municipio di Fiorano Modenese | EnelX
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiorano Modenese Silvio Pellico | EnelX
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Maranello Claudia | EnelX
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ubersetto Monte Ave Enel X | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-11-01
Uploaded by ForumElettrico.it on 2023-11-01
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26