Marina di Loanocharging location
Parcheggio pubblico a pagamento
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Ricarica è gratuita ma si trova all’interno del parcheggio del porto: costo orario 1,50 €, aperto h24. Leggi la recensione https://www.forumelettrico.it/forum/colonnina-marina-di-loano-sv-lungomare-nazario-sauro-12-t6435.html
https://www.forumelettrico.it/forum/colonnina-marina-di-loano-sv-lungomare-nazario-sauro-12-t6435.html Comment by ForumElettrico.it 03/30/2020 09:18:38
Other Charging Locations
There are 9 matching results
Hotel Garden Lido Loano
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Ewiva Conad Loano
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Keropetrol
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ai Pozzi Village & Spa
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Enel X Unità Spinale Unipolare
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Conad Toirano
4
9
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Villa Marina
1
7
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ceriale Lungomare Diaz | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity AdS Ceriale Sud
2
11
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by Sandro on 2021-06-05
Uploaded by ForumElettrico.it on 2020-03-30