To edit, add comments or upload photos: Sign In
Hotel Villa Marinacharging location
Nearest Address:
Corso Italia 221
Pietra Ligure
SV
Italy
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Private - For Staff, Visitors or Customers
Operational Status:
Operational
Latitude:
44.152799
Longitude:
8.29195
OCM Ref: OCM-131381
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-183932
11 kW
AC (Three-Phase)
400 V
16 A
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-11-kw-hotel-villa-marina-pietra-ligure-sv-corso-italia-121-t4480.html Comment by ForumElettrico.it 09/04/2019 15:11:22
Other Charging Locations
There are 9 matching results
Enel X Unità Spinale Unipolare
2
8
1.04 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Keropetrol
1.45 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad Loano
2
10
1.92 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Marina di Loano
1
2
2.02 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Garden Lido Loano
2.12 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Enel X charging Finalborgo
2.29 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ai Pozzi Village & Spa
2.85 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Conad Toirano
4
9
3.95 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ceriale Lungomare Diaz | EnelX
1
2
4.6 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04
Uploaded by ForumElettrico.it on 2019-09-04