Pontenure Bersani | EnelX Fastcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dall'altra parte della strada c'è un supermercato Conad ed intorno alcuni bar ed esercizi commerciali di vario tipo. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-fast-in-via-wladimiro-bersani-a-pontenure-pc-t11124.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-in-via-wladimiro-bersani-a-pontenure-pc-t11124.html Comment by ForumElettrico.it 09/19/2020 08:33:23
Other Charging Locations
There are 9 matching results
Enel X Coop
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cadeo San Francesco | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Saliceto Via del Ponte | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Electra centro comm.Gotico
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Supercharger Piacenza 2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Expo Le Mose
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Cadeo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge McDonald’s
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aldi Piacenza
2
6
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-09-19
Uploaded by ForumElettrico.it on 2020-09-19
Uploaded by ForumElettrico.it on 2020-09-19
Uploaded by ForumElettrico.it on 2020-09-19
Uploaded by ForumElettrico.it on 2020-09-19