Saliceto Via del Ponte | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata di fronte a una chiesa contenente il pianoforte in cui Giuseppe Verdi ha composto una sua opera. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-22-kw-cadeo-pc-via-del-ponte-16-saliceto-t28492.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-22-kw-cadeo-pc-via-del-ponte-16-saliceto-t28492.html Comment by ForumElettrico.it 11/12/2022 17:07:28
Other Charging Locations
There are 9 matching results
Municipio di Cadeo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cadeo San Francesco | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cadeo Palasport | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fontana Fredda 11 Settembre | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free To X AdS Arda Ovest
2
10
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Arda Est
3
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Cortemaggiore
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Pontenure Bersani | EnelX Fast
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12