Gardalandcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]4 colonnine con 2 prese Type2 l'una per un totale di 8 stalli situate a destra dell'entrata. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-gardaland-castelnuovo-del-garda-vr-via-derna-4-t10916.html
https://www.forumelettrico.it/forum/colonnine-enel-x-22-kw-gardaland-castelnuovo-del-garda-vr-via-derna-4-t10916.html Comment by ForumElettrico.it 04/03/2021 12:37:06
Other Charging Locations
There are 9 matching results
Hotel Parchi del Garda
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
T-Carica
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Camping Village le Palme - ZapGrid
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gardaland Hotel
1
2
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Del Garda Village and Camping
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via Venezia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ADS IP Peschiera del Garda | ENELX E-VIA FLEX-E
5
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-03
Uploaded by ForumElettrico.it on 2021-04-03