Gardaland Hotelcharging location
1 Tesla Connector, up to 22kW.Available by reservation only. Please call ahead.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (Tesla-only charging) http://www.teslamotors.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Tesla (Model S/X)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]2 Tesla Destination Charging, uno rosso e uno bianco (quindi per tutti). Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-22-kw-hotel-gardaland-castelnuovo-del-garda-vr-via-palu-1-t10917.html
https://www.forumelettrico.it/forum/colonnine-22-kw-hotel-gardaland-castelnuovo-del-garda-vr-via-palu-1-t10917.html Comment by ForumElettrico.it 04/04/2021 05:58:20
Other Charging Locations
There are 9 matching results
NEOGY Via Venezia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gardaland
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ADS IP Peschiera del Garda | ENELX E-VIA FLEX-E
5
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
T-Carica
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
IPlanet IP
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Del Garda Village and Camping
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity Peschiera
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-04
Uploaded by ForumElettrico.it on 2021-04-04