Ionity AdS Versilia Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ionity http://www.ionity.eu/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con card BeaglePlug ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post453877.html#p453877
https://www.forumelettrico.it/forum/post453877.html#p453877 Comment by ForumElettrico.it 07/27/2024 17:13:40
[ General Comment , Charged Successfully ]4 stalli HPC + una Tritium con Chademo e CCS2 da 50kW e Type2 da 43kW. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ionity-high-power-ads-versilia-est-pietrasanta-lu-a12-km-75-verso-genova-t22654.html
https://www.forumelettrico.it/forum/colonnine-ionity-high-power-ads-versilia-est-pietrasanta-lu-a12-km-75-verso-genova-t22654.html Comment by ForumElettrico.it 01/10/2022 06:52:00
Other Charging Locations
There are 9 matching results
Ionity AdS Versilia Ovest
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Verdemare
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Esselunga
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lido di Camaiore Kennedy | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Capezzano Pianore Acquarella | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Comune di Pietrasanta
3
Public
Operational
Lido di Camaiore Rosselli | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Giulia
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Forte Dei Marmi Supercharger
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-07-27
Uploaded by ForumElettrico.it on 2024-07-27
Uploaded by ForumElettrico.it on 2024-07-27
Uploaded by ForumElettrico.it on 2024-07-27
Uploaded by ForumElettrico.it on 2024-07-27
Uploaded by ForumElettrico.it on 2022-01-10
Uploaded by ForumElettrico.it on 2022-01-10
Uploaded by ForumElettrico.it on 2022-01-10
Uploaded by ForumElettrico.it on 2022-01-10