Forte Dei Marmi Superchargercharging location
http://www.unahotels.it/it/una_hotel_forte_dei_marmi/hotel_con_parcheggio_forte_dei_marmi.htm
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]20 colonnine di cui 8 V2 con doppio connettore e 12 V3 CCS2 max 250 kW, nei pressi dell'hotel che al momento è però chiuso. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-tesla-supercharger-forte-dei-marmi-lu-via-lorenzo-giglioli-t25078.html
https://www.forumelettrico.it/forum/colonnine-tesla-supercharger-forte-dei-marmi-lu-via-lorenzo-giglioli-t25078.html Comment by ForumElettrico.it 03/08/2023 07:11:37
Other Charging Locations
There are 9 matching results
Forte dei Marmi Resistenza | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Byron
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Eneldrive Forte Centro
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Comune di Pietrasanta
3
Public
Operational
Ionity AdS Versilia Ovest
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity AdS Versilia Est
2
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cinquale Del Freo | EnelX
3
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Verdemare
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Cinquale Grillotti | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-03-08
Uploaded by ForumElettrico.it on 2023-03-08
Uploaded by ForumElettrico.it on 2023-03-08
Uploaded by ForumElettrico.it on 2023-03-08