Enel X charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con card A2A sulla CCS Combo 2 ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post423501.html#p423501
https://www.forumelettrico.it/forum/post423501.html#p423501 Comment by ForumElettrico.it 01/18/2024 16:19:52
[ General Comment , Equipment & Location Confirmed Correct ]Nei pressi del centro commerciale "Lo Scrigno", ad una cinquantina di metri dalla SS 16. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-fast-in-via-olanda-a-termoli-t21668.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-in-via-olanda-a-termoli-t21668.html Comment by ForumElettrico.it 03/01/2022 13:52:20
Other Charging Locations
There are 9 matching results
Termoli CC La Fontana | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Municipio
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Euronics
2
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Q8
2
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aloha Park Hotel
1
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Free To X ADS Torre Fantine Est
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free to X Torre Fantine Ovest
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Commerciale Costaverde
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-01-18
Uploaded by ForumElettrico.it on 2024-01-18
Uploaded by ForumElettrico.it on 2024-01-18
Uploaded by ForumElettrico.it on 2024-01-18
Uploaded by ForumElettrico.it on 2024-01-18
Uploaded by ForumElettrico.it on 2022-03-01
Uploaded by ForumElettrico.it on 2022-03-01
Uploaded by ForumElettrico.it on 2022-03-01