Enel X Way Q8charging location
direction Campobasso - possibility to invert direction after 1 km
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Presso un distributore di benzina Q8 vicino al casello autostradale dell'A14, sulla Statale 87 comunemente conosciuta come SS Bifernina. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-hyperfast-enel-x-distributore-q8-ss87-bifernina-molise-t25893.html
https://www.forumelettrico.it/forum/colonnine-hyperfast-enel-x-distributore-q8-ss87-bifernina-molise-t25893.html Comment by ForumElettrico.it 03/18/2023 16:34:14
Rating: 5 out of 5 [ General Comment , Charged Successfully ]working very well bar opened every day 6-21
Comment by Roberto 08/29/2022 12:30:14
Other Charging Locations
There are 9 matching results
Enel X Way Euronics
2
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Termoli CC La Fontana | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Municipio
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aloha Park Hotel
1
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Free to X Torre Fantine Ovest
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X ADS Torre Fantine Est
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Commerciale Costaverde
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)