Br Charge Hotel Giada Via Nazionalecharging location

Nearest Address:
Via Nazionale
Grumolo delle Abbadesse
Veneto
36020
Italy

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 4
Usage: Public - Membership Required
Operational Status: Operational
Latitude: 45.50253438243661
Longitude: 11.639989551271697
OCM Ref: OCM-192962
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 70 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - No comments or check-ins
  •   User Feedback - No photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Operational
4 Present
OCM-CN-313680
22 kW AC (Three-Phase)
400 V
32 A

Add your own comment/check-in for this location:

Sign In

Other Charging Locations

There are 9 matching results

Ewiva Torri di Quartesolo
1  

Via Pola
Torri di Quartesolo
Veneto
36020
Italy
View
0.68 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Detas EVchargers 2x22kw Tamoil Tesina Sud
 

Service Area Tesina Sud A4 torino Trieste
Torri di quartesolo
VI
Italy
View
0.74 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)

CHARGEPOINT ads Tesina Sud direzione Venezia
 

A4, Autostrada Serenissima
Torri di Quartesolo
Veneto
36040
Italy
View
0.76 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Vicenza Supercharger anche per veicoli non Tesla
 

20 Via Brescia
Vicenza
36040
Italy
View
0.79 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

RI.CARICA - LE PIRAMIDI
 

Via Brescia
Torri di Quartesolo
Veneto
36020
Italy
View
0.8 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way Leroy Merlin
1   6

Via Brescia
Torri di Quartesolo
Veneto
36020
Italy
View
0.99 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Eneldrive Industria
 

Via Industria, 8
Torri di Quartesolo
VI
36040
Italy
View
2.22 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

POWY HPC Euronics
 

Viale della Serenissima
Vicenza
Veneto
36040
Italy
View
2.7 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge Via San Daniele
 

Via San Daniele
Camisano Vicentino
Veneto
36043
Italy
View
2.74 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In