Free To X AdS Castel Bentivoglio Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Free To X https://www.freeto-x.it/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Collocate 4 km dopo il casello di Bologna-Interporto e 9 km prima del casello di Altedo, perfettamente funzionanti con EWE Go fino a 225 kW. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-free-to-x-ads-bentivoglio-est-a13-verso-padova-t28569.html
https://www.forumelettrico.it/forum/colonnine-free-to-x-ads-bentivoglio-est-a13-verso-padova-t28569.html Comment by ForumElettrico.it 04/21/2025 15:33:17
Other Charging Locations
There are 9 matching results
Free To X AdS Castel Bentivoglio Ovest
2
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Interporto Bologna S.p.A.
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Casoni Bassa Superiore | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Interporto
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
DriWe EcorNaturaSì Interporto
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
DriWe EcorNaturaSì Interporto
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stiatico Alessandrini | EnelX
2
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Giorgio Rimembranza | EnelX
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Funo
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-04-21
Uploaded by ForumElettrico.it on 2025-04-21
Uploaded by ForumElettrico.it on 2025-04-21
Uploaded by ForumElettrico.it on 2025-04-21
Uploaded by ForumElettrico.it on 2025-04-21
Uploaded by ForumElettrico.it on 2025-04-21