Be Charge Cimiterocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto vi troviamo anche una pizzeria con di fronte un paio di supermercati, una farmacia e diversi esercizi commerciali. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-cimitero-di-quistello-mn-via-ugo-foscolo-10531-t25636.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-cimitero-di-quistello-mn-via-ugo-foscolo-10531-t25636.html Comment by ForumElettrico.it 06/13/2022 08:29:45
Other Charging Locations
There are 9 matching results
A2A MD
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Pesa di Nuvolato
1
2
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Campo Sportivo San Giacomo | BeCharge
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GasGas Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GasGas D'Annunzio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GasGas Coop
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Campo sportivo Schivenoglia
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Sustinente
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di San Giovanni del Dosso
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-13
Uploaded by ForumElettrico.it on 2022-06-13
Uploaded by ForumElettrico.it on 2022-06-13
Uploaded by ForumElettrico.it on 2022-06-13
Uploaded by ForumElettrico.it on 2022-06-13