BeCharge Campo sportivo Schivenogliacharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 4
Usage: Public - Membership Required
Operational Status: Operational
Latitude: 44.993726
Longitude: 11.071712
OCM Ref: OCM-169583
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Operational
4 Present
OCM-CN-258163
22 kW AC (Three-Phase)
400 V
22 A

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Andando a piedi verso il centro, in pochi minuti troviamo un bar. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-campo-sportivo-schivenoglia-mn-via-donatori-di-sangue-13-t13554.html

https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-campo-sportivo-schivenoglia-mn-via-donatori-di-sangue-13-t13554.html Comment by ForumElettrico.it 10/24/2020 09:08:50

Other Charging Locations

There are 9 matching results

evway Comune di San Giovanni del Dosso
3   7

Via Roma
San Giovanni del Dosso
MN
46020
Italy
View
1.97 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

EnerMia Campo Sportivo Comunale
1   5

Via Roma 2
San Giovanni del Dosso
MN
Italy
View
2.06 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge Villa Poma
1   5

Piazza Mazzali Romano 1
Borgo Mantovano
MN
Italy
View
2.08 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

evway Piazza Arvati
1   4

Via Arvati
Villa Poma
MN
46020
Italy
View
2.11 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Campo Sportivo San Giacomo | BeCharge
2   6

Via dello Sport 5
San Giacomo delle Segnate
MN
46020
Italy
View
2.18 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

evway Comune Di Poggio Rusco
3   5

Via Giuseppe Garibaldi, 11
Poggio Rusco
MN
46025
Italy
View
2.63 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

evway Comune di Pieve di Coriano
1   3

Via Gorgadelli, 7
Pieve di Coriano
MN
46020
Italy
View
3.21 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

A2A MD
2   6

Via Ugo Ruberti 18
Quistello
MN
Italy
View
4.23 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Pesa di Nuvolato
1   2

Via D. Semeghini, 88
Nuvolato
Quistello
MN
46026
Italy
View
4.28 Miles
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2020-10-24

Uploaded by ForumElettrico.it on 2020-10-24

Uploaded by ForumElettrico.it on 2020-10-24

Uploaded by ForumElettrico.it on 2020-10-24

Uploaded by ForumElettrico.it on 2020-10-24